We're 85% finished with the construction of the PRI building. Read about the campaign and help us achieve a better world today!

Building Progress

The one-acre site has been cleared, which is important to catch the maximum sunlight for the solar panels. The 600-foot road and parking area was improved with a layer of landscaping felt, railroad ballast (small rocks), and road bond. An underground water pipe 400 feet long was laid from the well at the Neohumanist College of Asheville. An underground electric line 300 feet long was laid by the French Broad Electric Cooperative Company from our neighbour Dharma’s adjacent land.

The building permit has been issued by Madison County. The septic tank and field have been installed and approved. The foundation has been dug and the basement walls have been constructed. The basement floor was waterproofed and the framing has begun. The siding, roof, windows and stairs have been complete. The next steps are insulation, dry wall, electrical, plumbing, flooring, trim, furnishings, and appliances.

Read more: Building plan | Financial need

 The siding has been added, and the electrical wiring is finished. July 15th, 2023.

May 15th, 2023
PRI framing with deck: Dec 17, 2022
PRI framing with deck: Dec 17, 2022
Nov. 18, 2022: PRI building including the cement posts to support the deck.
Nov. 18, 2022: PRI building including the cement posts to support the deck.
Nov 3, 2022: Initial framing on the ground floor
Nov 3, 2022: Initial framing on the ground floor

October 14, 2022: Flooring over the basement
October 14, 2022: Front entrance will be here
October 14, 2022: Basement framing
October 12, 2022: Future stairwell
October 12, 2022: Trusses covering the basement
September 27, 2022: Framing
September 26, 2022: Early framing in the basement
July 25, 2022: Basement walls poured with concrete.
July 25, 2022: Foundation complete side view.
July 25, 2022: Foundation complete.
July 25, 2022: Another view of the foundation progress.
July 25, 2022: Foundation is in place.
June 17, 2022: Front basement walls
June 17, 2022: Basement walls are constructed.
May 19, 2022: The basement is dug out.
May 19, 2022: The basement is dug out.
May 17, 2022: David and his father have marked out the building site.
May 4, 2022: Looking down Wellness Way towards the Prama Wellness Center.
May 4, 2022: Prout Prius car in the PRI parking lot.
March 2, 2022: Railroad ballast rocks now cover the felt on the road. Valmiki Bates, who helped for two weeks, rakes the future parking area.
February 14, 2022: Laying landscaping felt down on the 650-foot stretch of Wellness Way.
January 28, 2022: Peter W with his backhoe pulled out all the stumps and helped me burn them.
January 8, 2022: One of 14 wood piles we later burned.
October 2, 2021: Jeffry Steen, chain saw wizard
August 4, 2021: Designated PRI site is a young pine forest with thick undergrowth.